翻訳と辞書
Words near each other
・ Teddy bear toss
・ Teddy Bear, Duke & Psycho
・ Teddy Bears' Picnic
・ Teddy Bears' Picnic (disambiguation)
・ Teddy Bears' Picnic (film)
・ Teddy Benavídez
・ Ted Wilks
・ Ted Williams
・ Ted Williams (American football coach)
・ Ted Williams (American football)
・ Ted Williams (Australian footballer)
・ Ted Williams (disambiguation)
・ Ted Williams (equestrian)
・ Ted Williams (politician)
・ Ted Williams (voice-over artist)
Ted Williams Tunnel
・ Ted Willis, Baron Willis
・ Ted Wills
・ Ted Wilson
・ Ted Wilson (American football)
・ Ted Wilson (footballer)
・ Ted Wilson (mayor)
・ Ted Wingfield
・ Ted Winn
・ Ted Winship
・ Ted Winter
・ Ted Withers
・ Ted Wolf
・ Ted Woloshyn
・ Ted Wong


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Ted Williams Tunnel : ウィキペディア英語版
Ted Williams Tunnel

The Ted Williams Tunnel, also known as the Williams Tunnel, is the name of the third highway tunnel under Boston Harbor in Boston, Massachusetts, the Sumner and Callahan Tunnels being the other two. It connects South Boston with Logan International Airport, carrying the final leg of the Massachusetts Turnpike (Interstate 90) under Boston Harbor allowing direct access to Route 1A in East Boston. The tunnel is named after the former Boston Red Sox baseball player and U.S. Marine air corps veteran Ted Williams.
==History==

The Ted Williams Tunnel (TWT) was the first major link constructed as part of Boston's Big Dig. It is constructed from twelve "binocular" shaped steel sections fabricated in a Baltimore shipyard. These sections were then brought to the Black Falcon Pier near the site and each was fitted with a large surrounding mass of concrete (so that the tunnel section was more neutrally buoyant). Using additional flotation, the tunnel sections were then floated into place, lowered into a dredged channel, and joined to the other sections. At this point, the steel panels sealing the now-joined sections could be cut out and the finishing operations could be completed.
When the TWT opened in 1995 it was only available to authorized commercial traffic. Later, non-commercial traffic was allowed to access the tunnel on weekends and holidays. In 2003, with the substantial completion of the I-90 portion of the Big Dig, the tunnel was opened to all traffic at all times.
The tunnel is long, of which approximately are underwater. A toll of $3.50 is collected in the westbound direction, and the Fast Lane electronic toll collection system is in use. Commercial vehicles, including taxis, pay a toll of $5.25.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Ted Williams Tunnel」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.